Construction Waste

Waste generated through construction production, renovation and demolition works may be either sorted directly at source or delivered to such plants dealing with unsorted construction wastes. The immediate sorting of timber and metal waste into separated loads at source is usually a profitable solution.

Concrete and brick debris, as well as extractable soil resources and rock material, must also be source-separated as individual loads. Construction waste may not contain any hazardous waste or electric and electronic scrap.

Reception

Unsorted construction waste loads, as well as sorted timber, metal and energy fraction loads. Kuusakoski-Ekopark  and Lassila&Tikanoja  

Other construction waste

  • landfill loads containing construction waste, clean timber waste (i.e. no coated timber or sheeting), sorted rock-based materials > dispose of these at the HSY waste treatment centre  of Ämmässuo.
  • concrete and brick debris > Rudus Oy  extractable soil resources and rock material > municipal landfill areas